Nigeria Govt To Sell 5 Power Plants For $1 Billion

1706292179717.jpg

The Federal Government through the Bureau of Public Enterprises is currently carrying out transactions for the sale of five power plants under the National Integrated Power Projects at a cost of about $1.15bn, it was gathered on Tuesday.

Although sources familiar with the development explained that the cost of the plants should exceed $5bn based on international benchmark, they revealed that the BPE was planning to sell the facilities at a price that is a little above $1.1bn

The acting Director-General, BPE, Ignatius Ayewoh, confirmed to our correspondent in a brief telephone conversation that “the transaction is ongoing,” adding that “it is not concluded.”

The BPE boss did not disclose the cost for the five plants, as he quickly stated that he was in a meeting and would not be able to give additional details.

However, impeccable sources at the bureau named [b]the five power plants to include the 434 megawatts gas-fired Geregu II power plant, located in Kogi; 451MW Omotosho II plant in Ondo; and 750MW Olorunshogo II plant in Ogun State.

Others include the 563MW Odukpami power plant in Calabar, Cross River State; and the 451MW Benin-Ihovbor plant in Edo State.

It was gathered that the Omotosho plant, which has four power generating turbines, would be sold at about $85m; while the Olorunsogo NIPP with also four turbines would cost $170m.

The Benin-Ihovbor plant with five power generating turbines would go for $420m; Calabar Odukpami plant with five turbines would be sold at about $260m; while the Geregu plant with four turbines would go $215m.

Leave a Reply

Your email address will not be published. Required fields are marked *

scroll to top